πŸ“Ί No Thumbnail

Meltdown

Sandhogs

S01E08
December 14, 2008 60 min

Overview

At East Side Access, a rock face loaded with dynamite is primed for a blast that will clear a crossover tunnel space for the Roadheader. At the last second, a meltdown at Grand Central Terminal causes the blast to be delayed, leaving undetonated powder in the tunnel wall. All work at East Side Access grinds to a halt while the sandhogs wait for permission to shoot. Meanwhile, frustration builds on Martin and Ryan’s 7-line subway line gang. Already plagued by technical difficulties, they find undetonated dynamite from a previous blast lodged in the rock face. These β€œbootlegs” are one of the biggest threats any Sandhog crew can face, and prevents them from drilling and blasting. Back at East Side Access, veteran walking boss Billy Orrβ€”who witnessed a failed attempt to use the Roadheader five years beforeβ€”leaves this site for a traditional drill and blast job in the Bronx. Finally, the Roadheader arrives at the staging area. If it works, it will change the face of Sandhogging at this site.

Comments 0

Please log in to leave a comment.

No comments yet. Be the first to share your thoughts!