Hometime
Please log in to leave a comment.
No comments yet. Be the first to share your thoughts!
Feb 4, 2012
The new homeβs architecture is enhanced with continuity of garage doors, entry doors and shutters as the foundation is covered with natural thin veneer stone.
Feb 11, 2012
Dean, Miriam, Dan and Bucky pitch in to install a paver driveway, walkway and step veneer.
Mar 3, 2012
Dean, Miriam, and the Hometime crew begin updating the 1970βs remodel of a 1911 kitchen with new windows and a new patio door in the bumpout.
Mar 10, 2012
Double hung windows are updated with new inserts as Hometime guts the kitchen and reframes the powder room for a pocket door.
Mar 17, 2012
Dean and Miriam finish up rough-ins, insulation, drywall and priming to get ready for new cabinets.
Mar 24, 2012
Dean and Miriam show how to blend two different finishes as they install new cabinets.
Mar 31, 2012
Dean and Miriam get the kitchen, mud room and powder room areas ready for new flooring and countertops.
Apr 7, 2012
Itβs time for finishing touches as Dean and Miriam trim out the kitchen, mud room and powder room.
Apr 14, 2012
Dean, Miriam and the Hometime crew fire up the fixtures and appliances as they wrap up the project.
Apr 21, 2012
Dean and Miriam look at roofing, stone, garage doors and stamped concrete from the curb appeal perspective as a new home is built.
Apr 28, 2012
Dean and Miriam talk about roofing, railings and a realistic gas fireplace during the construction of a screen porch.
May 5, 2012
Dean and Miriam document the construction of two new homes, built inside a home and garden show.
May 12, 2012
Dean, Miriam and the crew demo some old kitchen countertops and install new quartz surfaces.
Oct 6, 2012
Finishing a hilly back yard with landscape steps and tile, a fire ring, plants and sprinklers.
Oct 13, 2012
Planting site-appropriate trees after a storm and building a crib for firewood cut and split from the damaged timber.
Oct 20, 2012
Pre-building timber frame walls inside and re-building on a new slab near Hometime Log Cabin.
Oct 27, 2012
Pre-building timber frame style roof trusses inside and re-assembling those on site as shed construction continues.
Nov 3, 2012
Taking out old concrete to repair, reframe and reseal the patio over a storage area.
Nov 10, 2012
Re-pouring and re-stamping the concrete patio while fixing up the storage area below.
Nov 17, 2012
Resetting an outdoor natural stone island, covering it with granite and setting a new built-in gas grill.
Nov 24, 2012
Updating an island kitchen with new cabinets includes visits with the designer and the manufacturer.
Dec 1, 2012
Finishing up the new cabinets for the island kitchen and covering those with new countertops.
Dec 8, 2012
Installing lights, plumbing fixtures and appliances.
Dec 15, 2012
Installing custom carriage house doors and laying a system of tailored pavers.
Dec 22, 2012
Installing clay tile roofing and natural stone cladding for the walls.
Dec 29, 2012
Finishing up the exterior and getting the new shed ready for winter.
Add a play
When did you watch this?
Install Scrob
Add to your home screen for the full app experience.
No comments yet. Be the first to share your thoughts!