Hometime
Please log in to leave a comment.
No comments yet. Be the first to share your thoughts!
Feb 6, 2010
The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.
Feb 13, 2010
The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.
Feb 20, 2010
The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.
Feb 27, 2010
The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.
Mar 6, 2010
The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.
Mar 13, 2010
The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.
Mar 20, 2010
The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.
Mar 27, 2010
The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.
Apr 3, 2010
The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.
Apr 10, 2010
The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.
Apr 17, 2010
The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.
Apr 24, 2010
The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.
Sep 11, 2010
The Hometime crew wraps up a project with a second floor yoga studio for βherβ and a garage-level workshop for "him."
Sep 18, 2010
After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.
Sep 25, 2010
The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.
Oct 2, 2010
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.
Oct 9, 2010
The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.
Oct 16, 2010
The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.
Oct 23, 2010
The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.
Oct 30, 2010
The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.
Nov 6, 2010
The Hometime crew installs custom cabinets for the laundry room and starts the homeβs wood flooring.
Nov 13, 2010
The home office begins to take shape, as the custom staircase work begins.
Nov 20, 2010
The stone countertops are fabricated and installed.
Nov 27, 2010
The Hometime crew installs cabinets, countertops and landscaping.
Jan 22, 2011
The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.
Jan 29, 2011
The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.
Add a play
When did you watch this?
Install Scrob
Add to your home screen for the full app experience.
No comments yet. Be the first to share your thoughts!